Home
overview
Products
contact us
Get an instant quote
Service your driveway
Image Gallery
easydriveways
helping you create an outdoors to be proud of
appointments and support
once you have ordered
planing permission
permable paving
planing permission
Do I Need Planning 

 Permission?

From October 1st 2008 a submission for Planning Permission will be required for Impermeable Surfaces, like Pattern Imprinted Concrete.
The Purpose of this requirement is to prevent the Stormwater Drain Sysytem in the road and eventually the rivers from being unnecessarily over filled in periods of heavy rainfall.
However :
These requirements do not apply to Wales & Scotland
They apply to the area between the front of the house and the road

Our Part

Our job is to try and satisfy the requirements of our customers and the local council.
We can do this with either Soakaways
driveway soakaway
or draining water to the garden.

On particularly poor drainage properties we are permitted to make use of the Storm Drains.

Conclusion

Providing we make our best effort to drain Driveway Accumulated Rainwater into the SUB soils below,
WE WILL NOT NEED PLANNING PERMISSION

Our Site Surveyor will look at all options in order that all requirements are met.
On rare occasions there may be no option but to apply for Planning Permission.
We will apply for permission which cost arund £150.00 and takes about 8 week to complete.




HomeoverviewProductscontact usGet an instant quoteService your drivewayImage Gallery